| Home | Terms of Use | Site Map | Contact Us |
IndustryCommunity.com > Electrical and Electronic Community > Power Plant Operations & DCS Control Forum > Message
Main Menu

[ List Subjects ][ Post Message ]
[ View Followups ][ Post Followup ]

Subject: Re: Advant OCS

Date: 01/21/02 at 11:39 PM
Posted by: Peter W O'Dwyer
E-mail: peter.w.odwyer@saint-gobain.com
Message Posted:

In Reply to: Advant OCS posted by Mark Silva on 02/19/01 at 5:48 AM:

Ctrl Sys Admin for large ABB MOD300 DCS at Saint-Gobain Abrasives (think sandpaper). Fate of system is uncertain.
24 MOD300 Multibus & ModelB Nodes v14.4
3 Advant Nodes OSES v1.7, OS 2.7 and AEH 2.1
19 Accuray 1180u Beta Gauges
4 AB PLC5 Interfaces.

Anyone interested in the OS node?

Follow Ups:

Post a Follow-up:


Message to Post:


1999-2001 Sunlit Technology Co., Ltd. All rights reserved.