| Home | Terms of Use | Site Map | Contact Us |
IndustryCommunity.com > Manufacturing Community > Jobs Forum > Message
Main Menu
Find

[ List Subjects ][ Current Board ][ Post Message ]
[ View Followups ][ Post Followup ]

Subject: Re: Query about unemployment insurance

Date: 02/05/03 at 2:08 PM
Posted by: mohamed elsayed
E-mail: zanak128@hotmail.com
Message Posted:

In Reply to: Re: Query about unemployment insurance posted by John Dunn - Consultant on 01/18/03 at 9:54 PM:

seeking for welding inspection job
this is the current resume...
==============================

c.v.

OBJECTIVE : To seek a challenging position as a welding engineer & NDT inspector

PERSONAL:
Name : MOHMED EL SAYED ABD EL AZIZ HUSSEIN SHAHATA
Martial Status : Engaged.
Military Service : Final exempted.
Address : El-Agamy-Shaher El-Asal Super Market Solouma Alexandria , Egypt.
E-mail : zanak128@hotmail.com zanak512@hotmail.com
Telephone No. : (03)3084205 - (03)4948090
Mobile : 0127227457

EDUCATION : High Graduate Five Years, LEVEL II ( R.T. , P.T. , M.T.)
Welding Inspection Technolgy (AWS-WIT)
(CAWI) Certified Associate Welding Inspector.

AWS Certificate No. : 01010304

AWS Membership No. : 503372
SKILLS :
* Visual welding inspection according to code specified in the WPS.
* Checking the isometric drawing , welding map & As built.
* Review the pickling ,flushing & hydraulic test .
* NDT nondestructive testing inspection according to code .
* Quality assurance & controller for welding operations.
* Controller for site material & pipe fitting.
* Supervise the hardness & PWHT.
* Inspection the plates of tank shell by (NDT).
* Control the fabrication sequence of floating roof tanks & hand over operations .
* Inspection to the tanks handover include (vacuum ,leak ) to the nozzles ,manholes ,
bottom of the tanks.
* inspection of the cold & hot cladding “insulation” of the towers .

EXPERIENCE: ( Starting from Current Employer ) .

1-From 1 st August 2002 until 31 october 2002 :

Company : CTU lead-etterkib (companies temporary union) “Seryan & Algerian companies”
Position : QA/QC Engineer
Project : Ohanet development gas plant.
Location : Ohanet – Algeria
Client : ABB. lummus global / petrofac
R.O : Sonatrack - Algeria

Duties & Responsibilities :

QA/QC Engineer for the (ISBL) “Inside Battery Limit” inside the gas plant, & (OSBL) outside battery limit “well heads”for construction ,make the (PMI) positive material identification for (OSBL) well heads duplex pipe lines , Preparing the equipment fixed & rotating hand over test package and steel structure, hydro test package, inspection of the welding operation according to the code specified. Responsible for fabrication of the “luncher and receiver” of the well heads and gas plant ,supervising the sealing & cladding of hot and cold insulation of the towers.

2 -FROM 1st September, 2001 To Until the end of July 2002 :

Company : THECHINT CIMI M ONTUBI “Italian company”
Position : QA / QC INSPECTOR.
Project : Portsaid – Gas – Fuel Fired Power Plant ( 2 X 341 MW UNITS )
Location : East Port Said.
Client : FOSTERWHEELER .
R.O : 3EC/EDF Egyptian Engineering Company

Duties & Responsibilities :

I’m responsible of the weding inspection & supervising the fit up of the 2 boilers units and welding operations, welding electrodes according to the proper procedure used ,preheating, post weld heat treatment & checking the steel structure errection & foundation instalation,checking the welding map and the code specified ASME B 31.1 ,ASME 9 and wps , review the radiography films & repair status ,the magnetic particles inspection to the buffle wall and the buck stay of the boilers wall ,the dye penetrant inspection of the steel structure and pipe lines supports, review the welding daily inspection report & gauging the temperature of the furnaces , portable heaters of the tempered electordes used., hand-over hydro test to the boiler “unit I”, steam pressure part ,the boiler unit was under (300 bar),make the asbuilt of the small bore attached to the steam drum & headers, large bore & the spray water ,putting the welding map on the new DW’G (As-built).


3- FROM 5 TH AUG., 2001 TO 15 TH AUG., 2001 :

Company : Castolin Eutectic “British Co.”
Position : Welding & NDT inspector .
Project : Mission of repaire a crack about 48mm of furnace ring of weigh 3 Tons.
Location : Alexandria , Egypt ,Elmax region .
Client : Blue circle cement co.
R.O : Alex ,Portland Cement Co. (APCC).

Duties & Responsibilities:
I was responsible of the mission by using the gauging carbon electrode ,Welding operation ,Controller for the preheat & heat treatment of the weldbead after finishing the weld ,The base metal was austenitic stainless steel .

Description of defect :
The defect was transfere crack with (48mm) depth ,It propagate into two transfere sections from the bottom to the surface parallel to the main crack .

Type of the used electrode :
Castolin electrode type (2222) with operated amperage about (120-175 amp) with low travel speed .

4- FROM DECEMBER, 2000 TO JULY, 2001 :

Company : FINCIMIC “Italian Co.”
Position : Welding & NDT inspector
Project : Expansion Lube Oil Plant.
Location : Alexandria , Egypt
Client : AMOC ( Alexandria Mineral Oil Company ).
R.O : Foster Wheeler France

Duties & Responsibilities :

The main job was installation of Amoc Plant , with a contract value $ 250 Million.
I am incharge of all site welding & NDT inspection , hardness test & PWHT, supervise the R.T. & P.T. reports, review isometric DRW’S, welding map & fabrication sequence, follow up modification ,as built & punch list, supervise the hydro & hydraulic test of high pressure pipelines.


5- FROM 31 MARCH TO NOVEMBER, 2000 :

Employer : FERROMETALCO. , EGYPT
Position : Welding & NDT inspector
Project : Expansion Lube Oil Plant ( 70 Tanks Project ).
Location : Alexandria , Egypt
Client : AMOC ( Alexandria Mineral Oil Company ).
R.O : Foster Wheeler France

Duties & Responsibilities :

Welding visual inspection ,Re-location to the hand over operaion of tanks to client (Foster wheeler) ,Follow up thefabrication sequence to floationg roof (thick 4mm,6mm) ,P.T. & R.T. inspection for vertial & horizontal welded shell of the tanks ,Control the handover operation include(vacuum-leakage) tests to the manhole, nozzles, bottom of the tanks & floating roofs .

During working in (FMC Co.AMOC Project ) period from 1st September till 5th December 2000 :
Follow the preparation to the (AWS) “ CWI ” Certified Welding Inspector program include the following categories :-

*Welding inspection technology “WIT ”with in the following items :
-Welding inspection and cerification .
-Safe practice for welding inspectors .
-Metal joining and cutting processes .
-Weld joint geometry and welding symbols .
-Document governing of welding inspector and qualification .

*Material properties and destructive testing :-
Hardness “Brinel ,Rockwell ” ,Toughness-Soundness-Guide Bend-NickBrack-Impact Tensile Strength .
-Metric practice for welding inspector .
-Welding metallurgy for welding inspector .
-Welding and base metal discontinuities .
-Visual inspection and other NDE “Non Destructive Examination methods ” (R.T. – P.T. – M.T. – U.T) .

*Exam Code Specified :-
API 1104 “ American Petroleum Institute ” .

6 - FROM NOVEMBER , 1999 TO JULY, 2000 :

Company : DAELIM INDUSTERIAL COMPANY “Korean Co.”
Position : Welding & NDT inspector
Project : Midor Refinery Plant.
Location : Alexandria , Egypt
Client : TECHNIP – TTIL-SNC

Duties & Responsibilities :

Site welding inspection , NDT nondestructive testing Radiographic inspetion ,Quality Assurance & controller for welding operations,Checking the welding joint marking on iso Dwg’S, Review site material and pipe fittings.

7 - FROM April , 1998 TO 30th September 1999 :

Company : FERROMETALCO - DSD EGYPT. “German Co.”
Position : Welding & NDT inspector
Project : Flat steel plant
Location : Alexandria , Egypt
Client : ANSDK ( Alexandria National Iron & Steel Company ).
R .O. : S M S

Duties & Responsibilities:

Site welding inspection and data source, Piping & dimension reports,R.T.daily production reports, Checking the isometric dwg’s & asbuilt for pipelines, Follow up the pickling & flushing pipelines tests.

COMPUTER SKILLS :

-Disk Operating System .
-Micro Soft windows.
-Micro Soft Excel 97..
-Micro Soft Winword 97.
-Micro Soft Power Point 97.

INTERNET :

Netscape Navigator - Internet Explorer

LANGUAGES:

English. (Fluent)

REFERANCES:

Referances will be furnished upon request.



Follow Ups:


Post a Follow-up:

Name:
E-Mail:
Subject:

Message to Post:

 

1999-2001 Sunlit Technology Co., Ltd. All rights reserved.