Subject: Re: NDT & Welding Inspector Vacancies

Date: 08/02/02 at 12:40 AM
Posted by: m ashery
E-mail: rajsharjah@yahoo.com
Message Posted:

In Reply to: Re: NDT & Welding Inspector Vacancies posted by N. Durai Raj on 01/31/01 at 9:39 PM:

NAME : MOHAMED ASHRY MOHAMED
DATE OF BIRTH : 16\4\2000
MOBIL : 010-1283399
HOME PHONE : 03-5740840
03-4223082
EMAIL : aiamoh@yahoo.com
ADDRESS : 16 ST. HUSSEN SHEREIN - LORAN
NEAR BANK MASR- LORAN
ALEX - EGYPT
Career job : mechanical engineer
JOB : Q.C ENGINEER

EDUCATION : 1984 technical high school
1993 B\C mechanical manufacture high institute
1998 B\C mechanical production engineer
COMPUTER SKIL L: Auto cad R14
Microsoft word97
Microsoft Eecel97
Net explores
COURSES : level II radio graphic test
Welding engineering processes inspection and quality control
Attending CWI courses.
EXPERIENCE : From 1984 up to date .
COMPANY : FOSTER WHEELEER FRANC.
PROJECT `: Amoc lube oil expansion.
COMPANY : Chime mantobe
Project : Amoc lube oil expansion
Company : Daelim engineering construction
Project : Midor refinery
Company : ABB sae sadelim
Project : power station
Company : Alekaria Egyptian mechanical engineer
Special Activity : I have tow design
-Power engine
- -Machine tool
Background
Machine tool, and maintenance and repair the engine and pump
Up to date in foster wheeler France


- 2 -

ENG\M.ASHRY

IN FOSTER WHEELER FRANCE
Lube oil expansion project
About 72 tanks

Responsibility
- Visual inspection.
- NDT for tanks according foster wheeler specification as: -
Roundness, plumpness, verticality for nozzle, orientation, pecking, banding alignment, settlement, dimension etc.
- Punch list for 71 tanks & one tank float.
- Punch list for piping lay out.
- Review the document.
- Check steam-tracing lines.
- Punch list for steam tracing lines.
- Hydro test for tanks & piping line.
- Final punch list for tanks category B.
- Pre commission for tanks.
- Start up for tanks commission.
- Hydro test and mechanical test for holding gas tanks diameter 5M.
- Modification for nozzle and plat form for tanks.
- Mechanical test for floating tank
- submerged arc welding fuul auto
The description of the job
- Control welding and welder
- non destructive test examination
- Radio graphic test
- Vacuum test
- Liquid penetrate test
- Visual test

Tank bottom welds and sump

- Check the sump visual before and after weld
- Vacuum box test at 2 psi to 5 psi
- Check butt weld annular pleats visually inspection complete weld and radio graphic test
- Shell to bottom (corner weld)
- Visual inspection and liquid P.T of attachment nozzle (reinforced bed)
- liquid test for the nozzle

Dimensional check
- Plumpness
- Roundness
Attachment
- Reinforced
- Air pursuer test at 10 psi to 15 psi
Fixed roof
- Visually inspection
- Vacuum box test at 2 psi to 4 psi
heating coil
Visual inspection, R\t and 100% P\T supporting
Up to date in foster wheeler France


In daelim engineering construction

Midor Refinery project
The job \ Q.C & Q, A

Responsibility
Visual inspection -
- Punch list for piping
- Review the welding document

The description of the job

- Check the joint before and after weld
- Control welding and welder
- Control non destructive test examination percentage according specification
- Flow up the ISO
- Remark repair joint
- Prepare the pneumatic test
- Raping test
- Holiday test according the standard and specification
- Punch list
- Calculate the percentage of NDT according the requirement
- Check ISO and P&ID

All this tests I was as wetness

Chime mantobe
Amoc lube oil expansion
Job \ Q.A & Q, C
Responsibility

Visual inspection-
- Punch list for piping
- Review the welding document

The description of the job
- Check the joint before and after weld
- Control welding and welder
- Control non destructive test examination percentage according specification
- Flow up the ISO
- Remark repair joint
- Prepare the pneumatic test
- Punch list

All this tests I was as wetness

ABB sae sadelim

Alkorimat power station
The job \ Q.C & Q, A

Responsibility

Visual inspection -
- Punch list for piping
- Review the welding document

The description of the job

- Check the joint before and after weld
- Control welding and welder
- control non destructive test examination percentage according specification
- flow up the ISO
- remark repair joint
- prepare the pneumatic test
- Raping test
- Check the joint before and after weld
- Control welding and welder
- Control non destructive test examination percentage according specification
- Flow up the ISO
- Remark repair joint
- Prepare the pneumatic test
- Punch list

All this tests I was as wetness


In Alekaria Egyptian mechanical engineer
My JOB as technical and operator Machine tool
My activity in this duration manufacture: -
Coupling.
Bolts all kinds.
Pulley.
Gears.
Grinding mechanical parts inner and outer diameter.
Manufacture the flange any diameter.
Maintenance and repair hydraulic pump.
Maintenance and repair the engine.
Maintenance and repair mechanical Parts.
Modification for mechanical parts.
Finishing the parts of equipment according standard and specification.
Machining mechanical parts as crank shaft, connected rod, cylinder head, crank shaft boring, piston cylinder.
Re machining the mechanical item and equipment.


The summery
In this duration I was work as operator Machine tools
- general lathe machine
- milling machine
- shaping machine
- drilling machine
- girding machine inner and outer diameter
- surface girding machine
- slot machine .
- center less grinding machine ,
- surface grinding machine .
- slot machine
- submerged arc welding full automatic


Special Activity
I have tow design
- Power engine
- Machine tool

In piping
Flow the iso and check the documents ,welding ,welder ,material, NDT , according the%,
In tanks
Aboui72 tanks my responsibility check welding and welder ,check dimension and NDT according API 650 .check the construction and nozzle
Check the verticality , settlement


Education

Secondary school
School name: Alras al sowda
From 1984 to 1997
Department: mechanical erection department
Piratical training during study
*Lathe machine
*Shaping machine
*Milling machine
About 14 hours every week
Study engineering drawing

High institute
From 1989/1991 to 1993\1993
High technology institute
Mechanical manufacture
During study in high institute I get piratical training
- Chemistry.
- Physics.
- Work shop in mechanical parts.
- Engineering drawing.
- Training in work shop about 6 hours in work shop

Engineering college
-Production engineer department
Computer skill
- Auto cad R 14
- Microsoft excel
- Microsoft word
- Microsoft power point
- mechanical desktop program
Special courses
- Level II Radio graphic test
- Welding engineering processes inspection and quality control
In American university in Cairo
- Preparation courses in certificate welding inspector CWI
- CWE certificate welding engineer

Skill and activity
- Operator machine and mechanical equipment.
-Mechanical engineer
- Q.C engineer