| Home | Terms of Use | Site Map | Contact Us |
IndustryCommunity.com > Manufacturing Community > Jobs Forum > Message
Main Menu
Find

[ List Subjects ][ Current Board ][ Post Message ]
[ View Followups ][ Post Followup ]

Subject: Re: application for the post of ndt,welding inspector or qa/qc(welding)engineer.

Date: 04/03/01 at 9:14 AM
Posted by: shailendra katyal
E-mail: shailendrakatyal@hotmail.com
Message Posted:

In Reply to: application for the post of ndt,welding inspector or qa/qc(welding)engineer. posted by ashish.a.bhate on 02/21/01 at 12:43 AM:

RESUME

NAME SHAILENDRA KATYAL

FATHER’S NAME Shri S.K.KATYAL

DATE OF BIRTH 7th SEPTEMBER ,1970

LANGUAGE KNOWN ENGLISH , HINDI , PUNJABI &MARATHI

MARITAL STATUS MARRIED

PRESENT ADDRESS

PERMANENT ADDRESS TYPE-IV / 28 -E
ANUKIRAN COLONY,P.O. BHABHANAGAR
VIA KOTA , RAJASTHAN
PIN : 323307, PH: 91 + 1475-33199
PASSPORT NO. A- 3980427
E-MAIL ADDRESS SHAILENDRAKATYAL@HOTMAIL.COM

WORK EXPERIENCE

ORGANISATION M/s. UB.ENGINEERING LIMITED

DURATION NOV’97 TO TILL DATE

DESIGNATION QUALITY ENGINEER

NATURE OF JOB
PRESENTLY WORKING FOR NIRMA LIMITED (SAVLI) CROSS COUNTRY PIPE LINE BETWEEN IOCL (DUMAD) TO NIRMA SAVLI AS A QUALITY INCHARGE.

PREVIOUS EXPERIENCE IN UB ENGINEERING LTD
WORKED FOR INDIAN PETROCHEMICAL CORPORATION LIMITED ( DAHEJ ) CROSS COUNTRY PIPE LINE PROJECT AS A QUALITY INCHARAGE

WORKED AS AN INDEPENDENT INCHARGE OF WELDING SECTION FOR 2x 500 MW UNITS FOR NTPC VIDHYACHAL SUPER THERMAL POWER PROJECT
WHERE I WAS SUPERVISING A TEAM FOR THE WELDING PROCESS LIKE GTAW & SMAW, PREHEATING , PWHT AND HARDNESS TEST.
DOING NDE WHICH INCLUDES DIE PENETRATION TEST , MAGNETIC PARTICLES TEST; RADIOGRAPHY& STRESS RELEIVING.
PREPRATION OF QUALITY PLANS, WPS ,PQR ,WELDERS TEST CERTIFICATES, ELECTRODES QUALIFICATION RECORDS ETC .

WORKED IN RAJASTHAN ATOMIC POWER PROJECT KOTA (RAJASTHAN)

FOREIGN ASSIGNMENT HANDLED WITH UB ENGINEERING LTD
FROM JAN’99 TO JULY’99 I WAS WORKING WITH EMIRATES TRADING AGENCY AS A QUALITY ENGINEER IN UAE . THE PROJECT I HANDLED WAS WATER DESALINATION PLANT WHERE I WAS RESPONSIBLE FOR WHOLE OF THE WELDING DEPARTMENT
…2…


KEY RESPONSIBILITIES :

PREPARATION OF QUALITY PLANS.

WELDERS QUALIFICATION TEST, DYE PENETRATION TESTS, RADIOGRAPHY, WELD VISUAL INSPECTION, VISUAL INSPECTION OF PACKAGES, HYDRAULIC TEST AND ALSO PREFABRICATION OF STAINLESS STEEL / CARBON STEEL PIPING FOR DESAL UNITS.
APART FROM THAT THE WELDERS JOBS DISTRIBUTION IS ALSO PERFORMED BY US

ORGANISATION : PCP INTERNATIONAL LTD.

DURATION : JUNE’97 TO NOV.’97

DESIGNATION : ENGINEER

NATURE OF JOB :

WORKED AS AN ENGINEER FOR THE PROJECT OF BHEL/JINDAL TRACTABEL POWER CO. LTD. IN BELLARY DIST. (KARNATAKA) DOING ERECTION, TESTING AND COMMISSIONING OF 2x130 MW BOILERS AND ITS ACCESSORIES.

ORGANISATION : CRUPP METALS

DURATION : SEPT’96 TO JUN’ 97.

WORKED AS A FIELD ENGINEER IN CRUPP METALS WHICH DEALS IN NAUFACTURING AND DESIGN OF IBR BOILERS, STEAM HEADERS, PRESSURE REDUCING STATION, DUAL WATER LEVEL CONTROLLER ETC.

QUALIFICATION :

EXAM. PASSED UNIV./BOARD NAME OF
INSTITUTIONS

SR. SECONDARY C.B.S.E. ATOMIC ENERGY
CENTRAL SCHOOL
RAWATBHATA.

B.E. IN MECHANICAL SHIVAJI UNIV. D.Y.PATIL COLLEGE
(YEAR 1996) OF ENGINEERING
& TECH. KOLHAPUR

Contd….3

…3…

NDT Course : ASNT Level – II in Radiographic Testing.

COMPUTER KNOWLEDGE :

Windows’ 95 MSOFFICE : MS WORD, MS EXCEL, POWER POINT.

PROJECT PREPARED : PNEUMATIC CONVEYING SYSTEM.
CONVEYING OF DUST WHEAT ETC.

SEMINAR : POWDER METALLURGY

VOCATIONAL TRAINING :

TWO WEEKS ADVANCE TRAINING IN AUTOMOBILE ENGINEERING AT INDUSTRIAL TRAINING INSTITUTE MAHARASHTRA.
FOUR WEEKS TRAINING IN GEAR ROLLING WORK AT NUCLEAR TRAINING CENTER RAJASTHAN ATOMIC POWER STATION, KOTA.

EXTRA CURRICULAR ACTIVITIES :

SCHOOL LEVEL TO COLLEAGE LEVEL WON MANY WINNER PRIZES IN BADMINTON, SWIMMING & TABLE TENNIS.


DATE : (SHAILENDRA KATYAL)


Follow Ups:


Post a Follow-up:

Name:
E-Mail:
Subject:

Message to Post:

 

1999-2001 Sunlit Technology Co., Ltd. All rights reserved.