| Home | Terms of Use | Site Map | Contact Us |
IndustryCommunity.com > Manufacturing Community > Jobs Forum > Message
Main Menu
Find

[ List Subjects ][ Current Board ][ Post Message ]
[ View Followups ][ Post Followup ]

Subject: Re: Engineers - Great Opportunity,

Date: 12/23/00 at 4:03 AM
Posted by: Friends Trade International
E-mail: friends@bdcom.com
Message Posted:

In Reply to: Re: Engineers - Great Opportunity, Great Company posted by Mahesh M. Patel on 11/08/00 at 10:57 AM:

We Messars Friends Trade International is an efficient trading house and enlisted supplier to Bangladesh Director General Defense Purchase(DGDP) Ministry of Defence. We have in the recent past worked with many overseas companies and successfully introduced them in our defense ministry. We maintain very good and close relationship with our Defence Ministry for promotion of Business.

Just now today we have receive some urgent inquiry for Inquiry for Generator Set. We are enclosing details specifications for your kind study.

Which will be purchase by bangladesh Navy through International Tender/bid.

Kindly confirm us over fax or e-mail that you are able to quote & supply then we will send you details Specification and others necessary tender documents and call for invoice.

Look forward to receiving your reply.

Best regards

Shahidul Islam
Business Development Manager

=============================
Friends Trade International
67, Mirpur Road, Kalabagan
Dhaka-1205, Bangladesh.
Tel : 880-2-9129563
Fax : 880-2-9111570
E-mail: friends@bdcom.com
============================

TENDER SPECIFICATIONS FOR GENERATOR SET 5 TO 7 KVA, QNTY : 80 NOS.
TENDER NO : ---------------

1. MODEL: TO BE MENTIONED

2. COUNTRY OF ORIGIN: EU/USA/CANADA/JAPAN -
3. YEAR OF PRODUCTION : BRAND NEW AND -
NOT EARLIER THAN 2000
4. ENGINE
A. MODEL: TO BE MENTONED -
B. HORSE POWER : 7 KW (MINIMUM) -
C. NUMBER OF CYLINDER : 4/6 -
D. NUMBER OF CYCLE/STROKE: 4 -
E. FUEL : DIESEL -
F. COOLING : AIR/WATER COOLED -
5. FUEL TANK CAPACITY : 100 LITRE (MINIMUM) -
6. FUEL CONSUMPTION : 8 TO 12 LITRE/HOUR -
7. ALTERNTOR
A. TYPE : BRUSH LESS, SELF EXCITED, SEALED -
BEARING AND 4 POLE
B. RATED OUTPUT : BETWEEN 50 TO 60 KVA -
C. RATED VOLTAGE : 380-440 VAC -
D. NUMBER OF PHASE & WIRE : 3 PHASE, 4 WIRE -
E. POWER FACTOR : 0.8 -
F. FREQUENCY : 50 HZ -
G. CONTINUOUS OPERATING HOUR : 8 TO 10 HOURS -
H. VOLTAGE REGULATION/TOLERANCE: 1.5% -
8. CONTROL PANEL : TO BE MOUNTED ON ANTI-VIBRATION -
MOUNT
A. METERS AND GAUGE : VOLTMETER, AMMETER, -
FREQUENCY METER, FUEL GAUGE, OIL GAUGE -
ETC.
B. SWITCHES : START/STOP KEY SWITCH, -
PHSE SELECTOR SWITCH (VOLT) ETC.
9. DIMENSIONS:
A. OVERALL LENGTH : TO BE MENTIONED -
B. OVERALL WIDTH : TO BE MENTIONED -
C. OVERALL HEIGHT : TO BE MENTIONED -
10. GROSS WEIGHT : TO BE MENTIONED -
11. WORKING CONDITION : THE GENERATOR -
MUST BE SOUND PROOF AND ABLE TO
OPERATE IN THE OPEN IN ALL WEATHER CONDITION
12. COVER/CANOPY : THE GENERATOR TO BE PROVIDED -
WITH ALL WEATHER AND DUST PROOF COVER/
CANOPY
13. MOUNTING : THE GENERATOR TO BE MOUNTED OVER -
STEEL BASE FRAME, WHICH SHALL BE PLACED/
INSTALLED ON ANY LEVEL SURFACE OR ANY CARRIER
VEHICLE/TRAILER
14. MOBILITY : THE GENERATOR TO BE TRAILER MOUNTED -
AND SUITABLE FOR ROAD AND PREFERABLY FOR
CROSS-COUNTRY MOBILITY
15. TRAILER : ARMY VEHICLE (3 TON TRUCK) MUST BE -
ABLE TO TOW THE GENERATOR SET OUNTED
ON THE TRAILER
A. WHEEL/TYRE : 4 -
B. TOW EYE/TOW BAR : TOW EYE/TOW BAR WITH -
TOWING HITCH
C. DRAW BAR : ADJUSTABLE -
D. JOCKY WHEEL AND PROPELLER STAND: -
ADJUSTABLE AND SLIDING TYPE
E. BRAKE : THE TRAILER MUST HAVE PROVISION -
OF MANUAL BRAKE, PARKING AND OVER-RUN
BRAKE AND PNEUMATIC SERVICE BRAKE
HAVING NATO TYPE CONNECTOR
F. REFLECTOR : ROD GOING REFLECTORS AND -
STOP LIGHT INDICATORS
G. SIZE AND WEIGHT : SHOULD BE APPROPRIATE TO -
CARRY THE GENERATOR SET
16. COLOUR : WHITE -
17. OPTIONAL ITEMS : TO BE MENTIONED ALONG WITH -
THE OFFER

18. TERMS OF PAYMENT L/C WILL BE OPENED IN FAVOR OF PRINCIPAL/SUPPLIER WITH PAYMENT TO BE MADE AS UNDER:

A) 80% OF C&F VALUE WILL BE PAID ON PRODUCTION OF NECESSARY SHIPPING DOCUMENTS.
REMAINING L/C AMOUNT WILL BE PAID SOON AFTER SATISFACTORY TEST, TRAIL AND COMMISSION FOLLOWED BY ACCEPTANCE CERTIFICATE.

B) IF YOUR OFFER IS ACCEPTABLE THEN THE FOREIGN PRINCIPAL WILL BE PROVIDE PERFORMANCE GUARANTEE @10% OF TOTAL CONTRACT VALUE AT THE TIME OF SIGNING THE CONTRACT AND BEFORE OPENING THE OPERATIVE L/C IN FAVOUR OF YOUR COMPANY.IT IS REFUNDABLE AFTER SATISFACTORY THE ACCEPTANCE.


TENDER SPECIFICATION FOR GENERATOR SETS 50 TO 60 KVA, QNTY : 18 NOS
TENDER NO : ------------------------


1. MODEL: TO BE MENTIONED
2. 0COUNTRY OF ORIGIN: EU/USA/CANADA/JAPAN -
3. YEAR OF PRODUCTION : BRAND NEW AND -
NOT EARLIER THAN 2000
4. ENGINE
a. MODEL: TO BE MENTONED -
b. TYPE: DIESEL ENGINE -
c. NUMBER OF CYLINDER : 1 -
d. FUEL : DIESEL -
e. COOLING : AIR/WATER COOLED -
5. FUEL TANK CAPACITY : 18-22 LITRE -
6. FUEL CONSUMPTION : 2-3 LITRE/HOUR -
7. STARTING SYSTEM : TO BE MENTIONED -
8. ALTERNTOR
A. TYPE : BRUSH LESS, SELF EXCITED -
B. RATED OUTPUT : BETWEEN 5 TO 7 KVA -
C. RATED VOLTAGE : 190-220 VAC -
D. NUMBER OF PHASE & WIRE : SINGLE PHASE, -
4 WIRE
E. POWER FACTOR : 0.8/1.0 -
F. FREQUENCY : 50 HZ -
G. CONTINUOUS OPERATING HOUR : 6 TO -
7 HOURS
H. VOLTAGE REGULATION/TOLERANCE: 1.5% -
9. CONTROL PANEL : TO BE MOUNTED ON ANTI-VIBRATION -
MOUNT
a. METERS AND GAUGE : VOLTMETER, AMMETER, -
b. SWITCHES : START/STOP KEY SWITCH, -

10. DIMENSIONS:
a. OVERALL LENGTH : TO BE MENTIONED -
b. OVERALL WIDTH : TO BE MENTIONED -
c. OVERALL HEIGHT : TO BE MENTIONED -
11. GROSS WEIGHT : TO BE MENTIONED -
12. WORKING CONDITION : THE GENERATOR -
MUST BE SOUND PROOF AND ABLE TO
OPERATE IN THE OPEN IN ALL WEATHER CONDITION
13. COVER/CANOPY : THE GENERATOR TO BE PROVIDED -
WITH ALL WEATHER AND DUST PROOF COVER/
CANOPY
14. COLOUR : WHITE -
15. OPTIONAL ITEMS : TO BE MENTIONED ALONG WITH -
THE OFFER

17. TERMS OF PAYMENT L/C WILL BE OPENED IN FAVOR OF PRINCIPAL/SUPPLIER WITH PAYMENT TO BE MADE AS UNDER:

A) 80% OF C&F VALUE WILL BE PAID ON PRODUCTION OF NECESSARY SHIPPING DOCUMENTS.
REMAINING L/C AMOUNT WILL BE PAID SOON AFTER SATISFACTORY TEST, TRAIL AND COMMISSION FOLLOWED BY ACCEPTANCE CERTIFICATE AS MENTIONED AT PARAGRAPH 13 ABOVE.

B) IF YOUR OFFER IS ACCEPTABLE THEN THE FOREIGN PRINCIPAL WILL BE PROVIDE PERFORMANCE GUARANTEE @10% OF TOTAL CONTRACT VALUE AT THE TIME OF SIGNING THE CONTRACT AND BEFORE OPENING THE OPERATIVE L/C IN FAVOUR OF YOUR COMPANY.IT IS REFUNDABLE AFTER SATISFACTORY THE ACCEPTANCE.


Follow Ups:


Post a Follow-up:

Name:
E-Mail:
Subject:

Message to Post:

 

1999-2001 Sunlit Technology Co., Ltd. All rights reserved.