| Home | Terms of Use | Site Map | Contact Us |
IndustryCommunity.com > Manufacturing Community > Trading Board A > Message
Main Menu
Find

[ List Subjects ][ Current Board ][ Post Message ]
[ View Followups ][ Post Followup ]

Subject: Re: Ferro Titanium

Date: 08/24/00 at 8:12 AM
Posted by: KETAN BANSAL
E-mail: ketan_essar@yahoo.com
Message Posted:

In Reply to: Ferro Titanium posted by Centaur Metals Alloys Limited on 04/18/00 at 4:08 AM:

SUB : Our Requirement of Ferro Titanium.
Dear Sir,

We request you to kindly send us your offer within 2/3 days ; for supply of following material ; as per the terms and conditions detailed below.

Item & Specifications

Ferro Titanium :
Ti : 30-35%, C : 0.2% max.; Al: 2% Min; Si : 3.00% or 7% max.
Size – 15 to 70 mm.
Tolerance +/- 5% on both oversize & undersize by mass. Free from slag & moisture. Powder 1% Max.
Packing : Steel Drums.
Qty. Required

Total : 350 MT


Delivery Schedule

Sept’00 : 75 Mt
Oct’00 : 75 Mt
Nov’00 : 50 Mt
Dec’00 : 50 Mt
Jan’01 : 50 Mt
Feb ’01 : 50 Mt

Partial Shipments allowed.
Lead Time required : _____
Remarks


Price Offered :
( Please offer both deliveries )

Country of Origin :
Name of Principals :

FOB Load Port

________ PMT

___________Port
CIF Mumbai / Hazira

_________ PMT

Payment Terms : 90 % thro’ CAD basis or Irrevocable Letter of Credit with 90 / 180 days Usance Credit @ LIBOR from the date of BOL. BALANCE 10% AFTER RECEIPT AND ACCEPTANCE OF MATERIAL AT OUR END. Confirmation of LC if required shall be to beneficiary’s account. Any other payment term shall not be given preference. All Bank charges , taxes and duties chargeable in respective banks & countries shall be to respective parties.
Inspection : By SGS / AH Knight / CCIB at seller’s option , to be done at the loading port shall be final. Third party inspection certificate has to be sent with each shipment. If there is any deviation in our test report and third party test report, joint sampling to be arranged at our plant.
Price Validity : Prices quoted shall be firm & fixed for the entire period of delivery schedule mentioned above. Kindly give the price validity upto 25th September 2000.

Regards

Ketan Bansal
Sr.Engineer ( Materials )


Follow Ups:


Post a Follow-up:

Name:
E-Mail:
Subject:

Message to Post:

 

1999-2001 Sunlit Technology Co., Ltd. All rights reserved.